NR 255.02(12) (12) “Plate soak" means the process operation of soaking or reacting lead subcategory battery plates, that are more than 2.5 mm. or 0.100 in. thick, in sulfuric acid.
NR 255.02(13) (13) “Trucked batteries" means batteries moved into or out of the plant by truck when the truck is actually washed in the plant to remove residues left in the truck from the batteries.
NR 255.02 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.03 NR 255.03Monitoring and reporting requirements. Compliance with the maximum monthly average effluent limitations and pretreatment standards listed in the tables for each regulated process is required regardless of the number of samples analyzed and averaged. The maximum monthly average effluent limitations and pretreatment standards listed in the tables for each regulated process shall be the basis for monthly average discharge limits in direct discharge permits and for pretreatment standards.
NR 255.03 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.04 NR 255.04Compliance date for PSES. The compliance date for pretreatment standards for existing sources is March 9, 1987.
NR 255.04 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
subch. II of ch. NR 255 Subchapter II — Cadmium Subcategory
NR 255.10 NR 255.10Applicability; description of the cadmium subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing cadmium anode batteries.
NR 255.10 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.11 NR 255.11Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 255.11(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BPT: - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
NR 255.11 Note 1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times.
NR 255.11(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 1 to 10. 
NR 255.11 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.12 NR 255.12Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 255.12(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BAT: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.12(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 11 to 18.
NR 255.12 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.13 NR 255.13New source performance standards.
NR 255.13(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards: - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times.
NR 255.13(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 19 to 26.
NR 255.13 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.14 NR 255.14Pretreatment standards for existing sources.
NR 255.14(1)(1) Except as provided in 40 CFR 403.7 and 403.13, any existing source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for existing sources: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.14(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 27 to 34.
NR 255.14 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.15 NR 255.15Pretreatment standards for new sources.
NR 255.15(1)(1) Except as provided in 40 CFR 403.7, any new source subject to this subchapter that introduces pollutants into a POTW shall comply with 40 CFR Part 403 and achieve the following pretreatment standards for new sources: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.15(2) (2) There may be no discharge allowance for process waste-water pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 35 to 42. 
NR 255.15 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
subch. III of ch. NR 255 Subchapter III — Calcium Subcategory
NR 255.20 NR 255.20Applicability; description of the calcium subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing calcium anode batteries.
NR 255.20 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.23 NR 255.23New source performance standards. There may be no discharge allowance for process wastewater pollutants from any battery manufacturing new source subject to this subchapter.
NR 255.23 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.25 NR 255.25Pretreatment standards for new sources. There may be no discharge allowance for process wastewater pollutants into a POTW from any battery manufacturing new source subject to this subchapter.
NR 255.25 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
subch. IV of ch. NR 255 Subchapter IV — Lead Subcategory
NR 255.30 NR 255.30Applicability; description of the lead subcategory. This subchapter applies to the discharge of pollutants to waters of the state and the introduction of pollutants into POTWs from manufacturing lead anode batteries.
NR 255.30 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.31 NR 255.31Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available.
NR 255.31(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BPT: - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times.
NR 255.31(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 43 to 53. 
NR 255.31 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.32 NR 255.32Effluent limitations representing the degree of effluent reduction attainable by the application of the best available technology economically achievable.
NR 255.32(1)(1) Except as provided in 40 CFR 125.30 to 125.32, any existing source subject to this subchapter shall achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of BAT: - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF - See PDF for table PDF
NR 255.32(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 54 to 62.
NR 255.32 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87; correction in (1) made under s. 13.92 (4) (b) 7., Stats., Register April 2013 No. 688.
NR 255.33 NR 255.33New source performance standards.
NR 255.33(1)(1) The discharge of wastewater pollutants from any new source subject to this subchapter may not exceed the following standards: - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times.
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times. - See PDF for table PDF
1 Within the range of 7.5 to 10.0 at all times.
NR 255.33(2) (2) There may be no discharge allowance for process wastewater pollutants from any battery manufacturing operation other than those battery manufacturing operations listed in tables 63 to 71.
NR 255.33 History History: Cr. Register, November, 1987, No. 383, eff. 12-1-87.
NR 255.34 NR 255.34Pretreatment standards for existing sources.
Loading...
Loading...
Published under s. 35.93, Stats. Updated on the first day of each month. Entire code is always current. The Register date on each page is the date the chapter was last published.